Clean air conditioning system is an indispensable part of pharmaceutical clean engineering.
After the construction of clean engineering in the completion of acceptance, should be carefully checked to prepare for acceptance of the data, generally including the following documents and records
People's nose, mouth, skin, hair and clothing will give off pollutants. Controlling the source of pollution is one of the important measures
The operation personnel in the clean room of the air shower room should work in strict accordance with the operating rules of the clean room
When the fan of the clean table does not operate, there are two reasons for this phenomenon. One is that the fan itself has a problem.
Promulgated by Decree No. 276 of the State Council of the People's Republic of China on January 4, 2000, and amended and adopted at the 39th
At present, the problem of environmental pollution has received much attention, and the state has continued to increase its efforts to control it, and the relevant input has been continuously increased. On March 28,
Purification project can be divided into: clean room, clean room, clean workshop, central air conditioning...... Xinruizhen (Xiamen) Purification Technology Co., Ltd. sets purification engineering design, processing,
Its clean room can also be called clean workshop, it is the air in the particles, harmful air, bacteria, as well as temperature, humidity, pressure control in a certain range of special room. However, the product is different, so the
The purification engineering preliminary purification engineering friends may contact the composition of the system does not understand, don't know what are the main purification engineering system, system composition, set net is simple for everyone here introduce clean engineering (purification engineering)
Clean room to obtain good clean effect, not only to focus on taking reasonable air conditioning purification measures, but also requires the process, construction and other professional to take corresponding measures: not only to have a reasonable design
Dust-free workshop ecological environmental protection and energy conservation and environmental protection: ecological environmental protection, energy conservation and environmental protection are the national strategic layout. Cleaning works should be carried out. In the process of transportation, storage and operation of engineering materials, environmental pollution shall be prohibited, and waste shall be treated separately